Asphalt Driveways
People form an opinion of your property based on the first thing they see when they arrive, your driveway. Whether you are looking to move or stay in your home, take care of your driveway – no property can be complete without a driveway in good condition. A cost-efficient and long-term solution, driveways are not too costly to maintain.
We are devoted to providing you with a firm and resilient pavement that is efficient and dependable for many years. We ensure a driveway that is completely beautiful and its quality is shown in its visual appeal. Our expertise lies in the minutiae from edges and corners to the right packing near structures and other pavements. The tamping of the edges is a fundamental element to the durability of the driveway. This provides proper assistance against crumbling edges and providing your driveway a nice finished look of neat lines and graceful curves.
Designed with great strength and durability, asphalt driveways are made to survive winter freeze and spring thaw. Asphalt paving projects can be done in a shorter amount of time as fewer steps are necessary for installation and repairs in comparison to concrete.
Asphalt paving projects are simpler and can be done in a shorter amount of time due to the lesser number of steps needed for installation and repairs when compared to concrete.

ASPHALT SERVICES IN KENOSHA
Asphalt Remove and Replace
Entirely removing the driveway reveals any underlying difficulties in the foundation, thus, ensuring the suitable steps are taken to have a driveway that is durable.
What is the best time to get a new Driveway?
If any of these issues are present, a total replacement of your driveway is essential:
- Extensive Cracking
- Settling of the driveway
- Water drainage & pitching issues
- Excessive asphalt crumbling into pieces
- Obvious Potholes
Asphalt Driveway Dig-out / Driveway Extension
Run out of parking spots for your visitors, RV, basketball, boat, or the newest driver in the family? Is your driveway unusually large or oddly shaped?Setting up an extension to your driveway may be the answer to parking concerns or dings for driveways that are too slim. Our professionals can give your driveway a facelift, rearrange the layout, or move it to a distinct area of your property! It is one of our most sought after asphalt paving services in Kenosha, Wisconsin.
When should I do an Asphalt Dig-out?
Whether you need to put in a new driveway or add square footage to an already present one.
Asphalt Driveway Overstone
Contending with irregularity, dirt, mud and a complete clutter on your gravel driveway may mean it is time to find out how to make it strong.
Asphalt Overstone is advantageous because excavation isn’t necessary, resulting in a lower cost.
In first step it is essential to establishthe correct level to prevent water from collecting on the surface.
Next, to construct a solid foundation, a layer of sub-base will be laid to provide a steady surface for the blacktop to adhere to.
Last we install 3″ asphalt and compact it.
When should I do it?
Overstone installed when the client already has a gravel base installed.
In any case, our staff must evaluate the heights and augment up to two inches of gravel.
A shallow excavation may be needed for clearing out.
Services comparison
Stages | Asphalt Remove & Replace | Asphalt Dig-out / Extension | Asphalt Overstone |
Excavation | Remove existing asphalt | Dig-out the existing dirt 9” | Minimum |
CA-6 stone base | Add up to 2” | Complete 6” base | Add up to 2” |
Shoot grades with laser level and fine grade for water drainage. | |||
Pave with 3” of asphalt surface and compact | |||
Pavement will be compacted with a 5-ton vibratory roller and finish roller. |
Driveway Overlay/Resurface
If duration isn’t a priority, resurfacing is the most economical way to make your driveway look new. Resurfacing an existing solid driveway should last 7-10 years, but some areas may require spot repair.
Driveways can be resurfaced or “overlayed” with asphalt. The prime candidate for a overlay is:
- A slightly cracked surface.
- The driveway is settled no more than 2″ low below the garage floor or has at least this amount of space from existing pavement to garage floor, city sidewalk, and entrance, and is in satisfactory to fair [shape|condition}.
- The driveway is long and can have sections corrected independently; benefit in terms of cost is not typically seen on smaller driveways as they may have to pay a minimum charge.
Other Asphalt Paving Services in Kenosha
Hard-wearing Pavement and a thicker stone for greater loads. (i.e.: boat parking, camper parking, or larger vehicle). For this we suggest 3″ or 4″ of blacktop in two lifts with a gravel base of 8″ or even 12″.
Our team offers complete or partial installations of basketball, tennis, and pickleball courts, as well as custom striping, all done in-house.
Sections that must be modified or revoked will have their current pavement and gravel removed, and the remaining area filled with dirt, topsoil, and seeds.
Asphalt installation and repairs can be simpler and more rapid than putting in concrete or brick, as fewer steps are needed to finish the task.
ASPHALT PAVING PROCESS
STEP 1.
DEMO & BASE PREPARATION
Upon arrival thethe crew will strip the current surface of the driveway, install the new stone base, flatten, and have it compressed and set for appraisal with the city or village needed.
Generally, the driveway will be available to park on following the base being readied.
STEP 2.
INSPECTIONS
Subsequent to base preparation, we shall arrange any necessary base inspections.
After the inspection has been approved, we will arrange for the installation of the pavement to take place within 1-3 days after the base has been prepared, depending on the weather conditions.
Most villages do not necessitate someone to be present for the inspection, but do require the permit to be visibly posted on the front window or door as well as have approved plans available if necessary.
In certain Villages, a base inspection is not necessary, and we will provide notice, paving can be done sooner if possible.
STEP 3.
PAVEMENT INSTALLATION
The road crew will finish the driveway by laying the asphalt and prohibiting access.
During construction, contact the local police department to acquire permission to park on the street.
CARE AND MAINTENANCE
AFTER PAVING COMPLETION
Follow a straight path when entering and exiting the driveway.
Refrain from turning the steering wheel when the car is not in movement or in an isolated spot.
Keep away from sharp objects on the driveway for the next two days, like high-heeled shoes, bicycle stands, roller blades, lawn mowers, and trailers.
Prevent leaving cars in your driveway for extended spans of time.
Keep from going beyond the edges of the driveway when driving.
If there is a drought, permit water to trickle over your driveway to keep it from cracking due to extreme dryness.
Seal-coat your driveway following a minimum of a 60 day time frame to a year since its completion to give the driveway time to cure.
Seal-coat your driveway annually.
SEAL COATING
COAL-TAR OR ASPHALT EMULSION APPLIED OVER ASPHALT SURFACES TO PROTECT FROM DAILY FROM DAILY DESTRUCTIVE FORCES.
1.
Shields against natural elements like sun, snow, ice and salt.
2.
Safeguards from the crumbling effects of oil, gas, and dangerous chemicals.
3.
Enhancing water discharge by filling in the asphalt pores and making a flat surface.
4.
Facilitates simpler scrubbing, tidying and upkeep of asphalt.
5.
Enhances the visual of any property by providing a black finish to asphalt.
6.
Increasing the lifespan of asphalt already in use and cutting down on repair costs to save money.