RESIDENTIAL ASPHALT PAVING SERVICES IN PARIS, WISCONSIN

STREAMLINED PERFORMANCE • SUPERB QUALITY

Asphalt Driveways

Your driveway gives visitors and passersby one of the first impressions of your property. Whether you are leaving or staying, pay attention to your driveway – no hardscape can be complete without an adequately maintained driveway. Economical and durable, driveways are also reasonably priced to maintain.

We are devoted to providing you with a firm and resilient pavement that is efficient and dependable for many years. We guarantee a driveway with a beautiful finish that is sure to impress. We pride ourselves on the meticulous care taken from borders and corners to the appropriate compressing alongside structures and other pavements. The tamping of the edges is an essential factor to the solidness of the driveway. This provides correct reinforcement against crumbling edges and bestowing your driveway a pleasant finished look of exact lines and curvilinear curves.

Crafted with strength and tenacity, asphalt driveways are constructed to bear the alternating temperatures of winter and spring. Asphalt paving projects demand fewer steps to complete the installation and repairs as opposed to concrete.

Asphalt paving is a quicker process than concrete as fewer steps are necessary for installation and repairs.

ASPHALT SERVICES IN PARIS

Asphalt Remove and Replace

Uncovering the underlying issues that can be found in the base by completely removing the driveway will guarantee the necessary measures are taken to install a driveway that is enduring.

What is the ideal time to put in a new Driveway?

If you come upon any of these issues, a complete replacement of your driveway is now essential:

  • Thorough Cracking
  • Settling of the driveway
  • Water drainage & pitching problems
  • Excessive asphalt crumbling into pieces
  • Evident Potholes

Asphalt Driveway Dig-out / Driveway Extension

Lack parking areas for your visitors, recreational vehicle, basketball, boat, or the latest driver in the family? Does your driveway have an over-sized or odd shape?Setting up an extension to your driveway may be the answer to parking concerns or dings for driveways that are too slim. We can alter the look of your driveway, modify the design, or move it to a different space on your property! It is one of our widely in demad asphalt paving services in Paris, Wisconsin.

When should I do an Asphalt Dig-out?

Whether you want to initiate a new driveway or add square footage to an existing one.

Asphalt Driveway Overstone

To make your gravel driveway strong and secure, you should think about how to address the irregularity, dirt and mud present.

Asphalt Overstone is a good idea since often it does not necessitate excavation, thus aiding to decrease cost.

First, examining the levels is necessary to make sure the water doesn’t form puddles on the ground.

Next, to produce a reliable platform, a sub-base will be laid down that is solid enough to maintain the asphalt placed upon it.

Last we install 3″ asphalt and compact it.

When should I do it?

Overstone is applied when the client already has a gravel base installed.

Still, our personnel must examine the heights and heighten up to two inches of gravel.

A minor dig may be obligatory for eliminating debris.

Services comparison
Stages Asphalt Remove & Replace Asphalt Dig-out / Extension Asphalt Overstone
Excavation Remove existing asphalt Dig-out the existing dirt 9” Minimum
CA-6 stone base Add up to 2” Complete 6” base Add up to 2”
Shoot grades with laser level and fine grade for water drainage.
Pave with 3” of asphalt surface and compact
Pavement will be compacted with a 5-ton vibratory roller and finish roller.

Driveway Overlay/Resurface

A resurface is a budget-friendly way of giving your driveway a facelift, if your priority isn’t its longevity. Resurfacing an existing solid driveway should last 7-10 years, but some areas may require spot repair.

Driveways can be resurfaced or “overlayed” with asphalt. The best candidate for a resurface is:

  • A slightly cracked area.
  • The driveway is settled at leastat minimum 2″ low below the garage floor or has at least this amount of space from existing pavement to garage floor, city sidewalk, and entrance, and is in good to fair [shape|condition}.
  • The driveway is long and can have segments corrected independently; financial benefit is not usually seen in small driveways as the minimum charge is still applicable.

Other Asphalt Paving Services in Paris

Heavy Duty Pavement and a thicker stone for increased loads. (i.e.: boat parking, camper parking, or bigger vehicle). For this we suggest 3″ or 4″ of blacktop in two lifts with a gravel base of 8″ or even 12″.

We provide full or partial installations of basketball, tennis, and pickleball courts, and can do custom striping layouts in-house.

Sections that must be changed or discontinued will have their pavement and gravel removed, and what is left will be filled with dirt, topsoil, and seeds.

Asphalt installation and repairs can be simpler and more rapid than putting in concrete or brick, as fewer steps are needed to finish the task.

ASPHALT PAVING PROCESS

STEP 1.

DEMO & BASE PREPARATION

Upon arrival, the team will take off the existing covering of the driveway, establish the fresh stone base, level out, leave it packed down and ready for review with the local village or city as directed.

Generally, the driveway will be available to park on following the base being readied.

STEP 2.

INSPECTIONS

Once the base has been prepared, we will arrange any desired base inspections.

Upon completion of the inspection, the date for the project pavement installation will be determined, typically 1-3 days after the base is ready, weather permitting.

There is not a requirement for anyone to be present during inspection in most villages, however the permit needs to be visibly posted on a front window or door, and approved plans must be accessible if needed.

If a base inspection is not necessary for particular Villages, we shall advise, and paving can be done as soon as possible.

STEP 3.

PAVEMENT INSTALLATION

The asphalt installation crew will finish the driveway by pouring the asphalt and keeping it off from traffic.

For the construction project, please speak to the local police department for permission to park on the street.

Are you searching for Asphlat Paving Sevices in Paris?

Total Paving provides the highest quality asphalt paving services in Paris, Wisconsin. Our experienced professionals will help you find the perfect solution to suit your needs.

CARE AND MAINTENANCE

AFTER PAVING COMPLETION

Pull in and out of the driveway in a straight line.

Refrain from turning the steering wheel when the car is not in movement or in an isolated spot.

Refrain from placing objects that are pointed on the driveway during the upcoming 48 hours, such as pointed-heels, bicycle kick-stands, roller blades, lawn mowers, or trailers.

Do not keep vehicles idle in your driveway for long periods.

Avoid going beyond the edges of the driveway while driving.

During droughts, grant water access to your driveway to forestall cracking due to excessive dryness.

Seal-coat your driveway at least 60 days but no more than a year after its completion for successful curing.

Seal-coat your driveway every year.

SEAL COATING

COAL-TAR OR ASPHALT EMULSION APPLIED OVER ASPHALT SURFACES TO PROTECT FROM DAILY FROM DAILY DESTRUCTIVE FORCES.

1.

Stops natural elements including sunlight, snow, ice and salt.

2.

Keeps from the decaying effects of oil, gas, and harmful substances.

3.

Enhancing water discharge by filling in the asphalt pores and making a flat surface.

4.

Makes sweeping, cleaning and looking after asphalt more straightforward.

5.

Upgrades the look of any property with a black finish given to asphalt.

6.

Prolonging the life of asphalt already in place and saving money on repairs by cutting costs.