RESIDENTIAL ASPHALT PAVING SERVICES IN PARIS, WISCONSIN

STREAMLINED PERFORMANCE • SUPERIOR QUALITY

Asphalt Driveways

The look of your driveway sets the tone for people’s opinions of your property when they first arrive. Whether you are relocating or staying, make sure your driveway is not ignored – no property’s landscape is complete without a driveway that is taken care of. Cost-effective, long-lasting and durable, driveways are reasonably priced to maintain.

We are dedicated to furnishing you with a tough and lasting pavement that is dependable and trustworthy for years to come. A driveway that is fully attractive and demonstrates its quality through its beauty is what we guarantee. Our strength is in the details from perimeters and corners to the precise packing next to structures and other pavements. The tamping of the edges is a crucial component to the robustness of the driveway. This provides proper assistance against crumbling edges and providing your driveway a nice finished look of neat lines and graceful curves.

Constructed to be tough and enduring, asphalt driveways are crafted to brave the cold and warm temperatures of winter and spring. Asphalt paving is a quicker process than concrete as fewer steps are necessary for installation and repairs.

Asphalt paving projects are more easily and quickly done than concrete as it requires less steps to complete the installation and repairs.

ASPHALT SERVICES IN PARIS

Asphalt Remove and Replace

By completely removing the driveway, we can find the hidden issues that may be in the foundation, guaranteeing the appropriate steps are taken to create a lasting driveway.

When should I replace my Driveway?

If you see any of these problems, a total replacement of your driveway is now essential:

  • Thorough Cracking
  • Settling of the driveway
  • Water drainage & pitching problems
  • Excessive asphalt crumbling into pieces
  • Visible Potholes

Asphalt Driveway Dig-out / Driveway Extension

Lack parking areas for your visitors, recreational vehicle, basketball, boat, or the latest driver in the family? Is the size of your driveway unusually large or irregular?Installing an extension to your driveway could be the reply to parking issues or scratches for driveways that are too slight. Our experts can revamp your driveway, adjust the layout, or shift it to a different spot on your property! It is one of our most popular asphalt paving services in Paris, Wisconsin.

When should I do an Asphalt Dig-out?

Whether you need to put in a new driveway or add square footage to an current one.

Asphalt Driveway Overstone

You may want to consider how to make your gravel driveway strong and solid if it is irregular, muddy, and full of dirt.

Going with Asphalt Overstone is a sound decision as excavation is usually not necessary, thus lowering cost.

In first step it is essential to establishthe correct level to prevent water from collecting on the surface.

Next, establishing a sub-base will create a level surface that is strong enough to sustain the blacktop being put down on top of it.

Last we install 3″ asphalt and compact it.

When should I do it?

Overstone is placed when the client already has a gravel base laid.

In any case, our staff must evaluate the heights and augment up to two inches of gravel.

A shallow excavation may be needed for clearing out.

Services comparison
Stages Asphalt Remove & Replace Asphalt Dig-out / Extension Asphalt Overstone
Excavation Remove existing asphalt Dig-out the existing dirt 9” Minimum
CA-6 stone base Add up to 2” Complete 6” base Add up to 2”
Shoot grades with laser level and fine grade for water drainage.
Pave with 3” of asphalt surface and compact
Pavement will be compacted with a 5-ton vibratory roller and finish roller.

Driveway Overlay/Resurface

If duration isn’t a priority, resurfacing is the most economical way to make your driveway look new. With a dependable existing driveway surface, a resurfacing job should last 7-10 years, though spot patching may be needed in some regions.

Driveways can be resurfaced or “overlayed” with asphalt. The prime candidate for a overlay is:

  • A minimally cracked surface.
  • The driveway is settled no more than 2″ low below the garage floor or has at least this amount of space from current pavement to garage floor, city sidewalk, and entrance, and is in satisfactory to average [shape|condition}.
  • The driveway is long and can have segments corrected independently; financial benefit is not usually seen in small driveways as the minimum charge is still applicable.

Other Asphalt Paving Services in Paris

Sturdier Pavement and a thicker stone for heavier loads. (i.e.: boat parking, camper parking, or heavier vehicle). For this we recommend 3″ or 4″ of blacktop in two lifts with a gravel base of 8″ or even 12″.

We provide full or partial basketball, tennis, and pickleball court installations, and have the capability to do custom striping in-house.

Modifications or abolishment of sections necessitate the clearing of the current pavement and gravel, the leftover area to be filled with dirt, topsoil, and seeds.

Asphalt installation and repair can be more straightforward and quicker than the installation of concrete or brick, with fewer steps necessary to finish off the project.

ASPHALT PAVING PROCESS

STEP 1.

DEMO & BASE PREPARATION

Upon arrival, the the crew will strip the current covering of the driveway, put in the new stone base, flatten, and have it compacted and set for inspection with the city or village needed.

Generally, the driveway will be ready for parking once the groundwork is prepared.

STEP 2.

INSPECTIONS

Following base development, we shall arrange any compulsory base evaluations.

When the inspection has been passed, the project pavement installation date will be scheduled, which is normally 1-3 days after the base is ready, weather permitting.

In most villages, it is not necessary for anyone to be present during the inspection, though it is compulsory for a permit to be visibly displayed on a front window or door, and approved plans to be made available in case of need.

Where a base inspection is not required for some Villages, we shall advise, and paving can be done without delay.

STEP 3.

PAVEMENT INSTALLATION

The asphalt workers will finish the driveway by pouring the asphalt and keeping it inaccessible to cars.

When constructing, reach out to your local police department for authorization to park on the street.

Are you interested in Asphalt Paving Sevices in Paris?

Total Paving provides the highest quality asphalt paving services in Paris, Wisconsin. Our experienced professionals will help you find the perfect solution to suit your needs.

GET FREE QUOTE

CARE AND MAINTENANCE

AFTER PAVING COMPLETION

Follow a straight path when entering and exiting the driveway.

Keep from turning the steering wheel when the automobile is not in motion or in an isolated region.

Do not place any objects with sharp edges on the driveway for the next two days, for instance, pointed-heels, bicycle kick-stands, roller blades, lawn mowers, or trailers.

Do not permit cars to stay in your driveway for extended periods.

Do not go beyond the boundaries of the driveway when driving.

During periods of drought, enable water to pass over your driveway to prevent cracking caused by intense dryness.

Seal-coat your driveway no less than 60 days but no more than a year after it has been completed for an optimal curing process

Seal-coat your driveway after 12 months.

SEAL COATING

COAL-TAR OR ASPHALT EMULSION APPLIED OVER ASPHALT SURFACES TO PROTECT FROM DAILY FROM DAILY DESTRUCTIVE FORCES.

1.

Guards against natural elements including sun, snow, ice and salt.

2.

Shields from the crumbling effects of petroleum, gas, and toxic chemicals.

3.

Boosting water runoff by stuffing asphalt pores and constructing a flat surface.

4.

Makes it easier to sweep, clean and maintain asphalt.

5.

Revitalizes the look of any property by providing asphalt with a black finish.

6.

Maximizing the life of asphalt already in place and saving money on repair costs.

DOWNLOAD CARE INSTRUCTIONS