RESIDENTIAL ASPHALT PAVING SERVICES IN PLEASANT PRAIRIE, WISCONSIN

STREAMLINED PERFORMANCE • MATCHLESS QUALITY

Asphalt Driveways

Visitors and passersby are presented with the look of your driveway, forming one of the first impressions. Whether you are selling or staying, do not forget your driveway – no hardscape is finished without a driveway in good condition. Economical, tough and long-lasting, driveways are also reasonably priced to preserve.

We are devoted to providing you with a firm and resilient pavement that is efficient and dependable for many years. We ensure an attractive driveway that demonstrates its excellence through its looks. Our specialty is exactness from sides and corners to the proper compaction beside structures and other pavements. Tamping of the edges is a major contributor to the strength of the driveway. This renders appropriate sustenance against crumbling edges and furnishing your driveway a delightful completed look of orderly lines and curving curves.

Built to be robust and resilient, asphalt driveways are constructed to handle the extreme temperatures of winter freeze and spring thaw. In comparison to concrete, asphalt paving projects can be done at a faster rate since fewer steps are needed to complete the installation and repairs.

Asphalt paving projects are simpler and can be done in a shorter amount of time due to the lesser number of steps needed for installation and repairs when compared to concrete.

ASPHALT SERVICES IN PLEASANT PRAIRIE

Asphalt Remove and Replace

Completely removing the driveway helps to detect any potential issues in the foundation, thus assuring the necessary procedures are taken to put in a driveway that will remain.

When should I replace my Driveway?

If any of these problems arise, it’s time for a full replacement of your driveway:

  • Extensive Cracking
  • Settling of the driveway
  • Water drainage & pitching problems
  • Excessive asphalt crumbling into pieces
  • Noticeable Potholes

Asphalt Driveway Dig-out / Driveway Extension

Run out of parking spots for your visitors, RV, basketball, boat, or the newest driver in the family? Is the size of your driveway unusually large or irregular?Extension installation to your driveway may be the remedy to parking complications or dents for driveways that are too slender. Our professionals can give your driveway a facelift, rearrange the layout, or move it to a distinct area of your property! It is one of our widely in demad asphalt paving services in Pleasant Prairie, Wisconsin.

When should I do an Asphalt Dig-out?

Whether you need to install a fresh driveway or add square footage to an already present one.

Asphalt Driveway Overstone

If your gravel driveway has become an irregular, mucky, dirty mess, you might need to figure out how to make it strong and solid.

Asphalt Overstone is the sensible selection since often excavation is not necessary, thus reducing cost.

First we check the level to have the correct grade so that standing water does not accumulate on the ground.

Next, by laying down a sub-base, a flat platform will be formed that is strong enough to hold the blacktop that is being applied on top of it.

In final step we install 3″ asphalt and compact it.

When should I do it?

Overstone installed when the client already has a gravel base laid.

Still, our personnel must examine the heights and heighten up to two inches of gravel.

A shallow dig may be compulsory to keep the area clean.

Services comparison
Stages Asphalt Remove & Replace Asphalt Dig-out / Extension Asphalt Overstone
Excavation Remove existing asphalt Dig-out the existing dirt 9” Minimum
CA-6 stone base Add up to 2” Complete 6” base Add up to 2”
Shoot grades with laser level and fine grade for water drainage.
Pave with 3” of asphalt surface and compact
Pavement will be compacted with a 5-ton vibratory roller and finish roller.

Driveway Overlay/Resurface

If duration isn’t a priority, resurfacing is the most economical way to make your driveway look new. A resurfacing job on a dependable existing driveway surface is typically good for 7-10 years, though spot repair may be needed in some areas

Driveways can be resurfaced or “overlayed” with asphalt. The ideal candidate for a resurface is:

  • A minimally cracked surface.
  • The driveway is settled at leastat minimum 2″ low below the garage floor or has at least this amount of space from current pavement to garage floor, city sidewalk, and entrance, and is in satisfactory to fair [shape|condition}.
  • The driveway is long and can have sections corrected independently; it is unlikely that smaller driveways will see any cost advantages due to the minimum payment that has to be made.

Other Asphalt Paving Services in Pleasant Prairie

Hard-wearing Pavement and a thicker stone for greater loads. (i.e.: boat parking, camper parking, or bigger vehicle). For this we suggest 3″ or 4″ of blacktop in two lifts with a gravel base of 8″ or even 12″.

Our team is equipped to install full or partial basketball, tennis, and pickleball courts, and we can provide custom striping services in-house.

Sections that require alteration or dismantlement will have their existing pavement and gravel removed, and the remaining area will be filled with dirt, topsoil and seeds.

Asphalt installation and repair can be less complicated and quicker than the laying of concrete or brick, since there are fewer steps to complete the job.

ASPHALT PAVING PROCESS

STEP 1.

DEMO & BASE PREPARATION

On their arrival, the team will strip the prevailing surface of the driveway, set up the new stone base, grade, and leave it compressed and prepared for inspection with the local town or municipality as necessary.

Generally speaking, once the base is set, parking in the driveway should be possible.

STEP 2.

INSPECTIONS

After the base is ready, we will arrange any necessary base inspections.

Upon successful inspection, the date for the pavement installation will be determined, which is usually 1-3 days after the base is ready, weather permitting.

There is not a requirement for anyone to be present during inspection in most villages, however the permit needs to be visibly posted on a front window or door, and approved plans must be accessible if needed.

If a base inspection is not mandatory in certain Villages, we will advise, paving can be done quickly.

STEP 3.

PAVEMENT INSTALLATION

The asphalt installation team will conclude the driveway by pouring the asphalt and restricting it from vehicles.

During the construction process, please contact your local police department for permission to park on the street.

Are you looking for Asphalt Paving Sevices in Pleasant Prairie?

Total Paving provides the highest quality asphalt paving services in Pleasant Prairie, Wisconsin. Our experienced professionals will help you find the perfect solution to suit your needs.

CARE AND MAINTENANCE

AFTER PAVING COMPLETION

Move in a straight line when driving in and out of the driveway.

Do not rotate the steering wheel when the vehicle is not in progress or in an isolated place.

Do not place any objects with sharp edges on the driveway for the next two days, for instance, pointed-heels, bicycle kick-stands, roller blades, lawn mowers, or trailers.

Abstain from allowing cars to remain in your driveway for prolonged durations.

Keep from going beyond the edges of the driveway when driving.

In the event of a drought, let the water flow over your driveway to avoid cracking due to excessive aridity.

To give your driveway an adequate amount of curing time, seal-coat it no sooner than 60 days after its completion and no later than a year.

Seal-coat your driveway yearly.

SEAL COATING

COAL-TAR OR ASPHALT EMULSION APPLIED OVER ASPHALT SURFACES TO PROTECT FROM DAILY FROM DAILY DESTRUCTIVE FORCES.

1.

Fends off natural elements such as sun, snow, ice and salt.

2.

Secures from the deteriorating effects of petroleum, gas, and toxic chemicals.

3.

Enhancing water discharge by plugging asphalt pores and forming a level surface.

4.

Allows for easier sweeping, cleaning and sustaining of asphalt.

5.

Gives a black finish to asphalt to increase the attractiveness of any property.

6.

Enhancing the durability of existing asphalt and cutting down on repair costs to save money.