RESIDENTIAL ASPHALT PAVING SERVICES IN SOMERS, WISCONSIN

STREAMLINED PERFORMANCE • TOP_NOTCH QUALITY

Asphalt Driveways

What people see when they arrive at your property is your driveway, providing one of the first impressions. Whether you are selling your home or looking to stay, be sure your driveway is not overlooked, as no property’s hardscape is complete without a well-kept driveway. Economical, durable and long-lasting, driveways are also not too costly to preserve.

We are devoted to giving you a sturdy and enduring pavement that is dependable and reliable for years to come. We guarantee a driveway that is entirely aesthetically pleasing and its quality is revealed through its looks. Our strength is in attention to detail from borders and corners to the accurate compaction near structures and other pavements. The tamping of the edges is a critical factor in the solidity of the driveway. This delivers appropriate backing against crumbling edges and endowing your driveway a comely finished bearing of unbroken lines and lithe curves.

Designed with great strength and durability, asphalt driveways are made to survive winter freeze and spring thaw. Asphalt paving projects can be accomplished in a shorter time frame due to the fewer steps needed for installation and repairs compared to concrete.

In comparison to concrete, asphalt paving projects can be done at a faster rate since fewer steps are needed to complete the installation and repairs.

ASPHALT SERVICES IN SOMERS

Asphalt Remove and Replace

Removing the driveway thoroughly will uncover any underlying difficulties in the foundation, thus, making certain the right steps are taken to build a driveway that is long-lasting.

What is the best time to get a new Driveway?

If you detect any of these issues, it is now necessary to totally replace your driveway:

  • Extensive Cracking
  • Settling of the driveway
  • Water drainage & pitching problems
  • Excessive asphalt crumbling into pieces
  • Evident Potholes

Asphalt Driveway Dig-out / Driveway Extension

Run out of parking areas for your company, recreational vehicle, basketball, boat, or the newest driver in the family? Is your driveway unusually large or oddly shaped?Incorporating an extension to your driveway may be the answer to parking issues or dents for driveways that are too slight. We are capable of reshaping your driveway, altering the arrangement, or repositioning it on your property! It is one of our widely sought after asphalt paving services in Somers, Wisconsin.

When should I do an Asphalt Dig-out?

Whether you want to initiate a new driveway or add square footage to an already present one.

Asphalt Driveway Overstone

If your gravel driveway is a chaotic mess, with irregularity, dirt, and mud, you should try to figure out how to make it strong and dependable.

Asphalt Overstone is the optimal decision as it does not necessitate excavation, thus reducing cost.

First we check the level to have the correct grade so that standing water does not accumulate on the ground.

Next, to make a secure foundation, a sub-base will be laid creating a plane that is resilient enough to support the asphalt being placed over it.

In final step we install 3″ asphalt and compact it.

When should I do it?

Overstone is applied when the client already has a gravel base installed.

In any case, our staff must analyze the measures and boost to a sum of two inches of gravel.

A shallow dig may be compulsory to keep the area clean.

Services comparison
Stages Asphalt Remove & Replace Asphalt Dig-out / Extension Asphalt Overstone
Excavation Remove existing asphalt Dig-out the existing dirt 9” Minimum
CA-6 stone base Add up to 2” Complete 6” base Add up to 2”
Shoot grades with laser level and fine grade for water drainage.
Pave with 3” of asphalt surface and compact
Pavement will be compacted with a 5-ton vibratory roller and finish roller.

Driveway Overlay/Resurface

Resurfacing is an economical approach to giving your driveway a fresh facade without investing in extended life. Generally, a resurfacing project over an existing steady driveway surface will last approximately 7-10 years, though some spots may need to be patched.

Driveways can be resurfaced or “overlayed” with asphalt. The prime candidate for a overlay is:

  • A slightly cracked surface.
  • The driveway is settled no more than 2″ low below the garage floor or has at least this amount of space from existing pavement to garage floor, city sidewalk, and entrance, and is in good to fair [shape|condition}.
  • The driveway is long and can have sections fixed independently; cost benefits are generally not seen with smaller driveways as the minimum payment still applies.

Other Asphalt Paving Services in Somers

Sturdier Pavement and a thicker stone for greater loads. (i.e.: boat parking, camper parking, or heavier vehicle). For this we recommend 3″ or 4″ of blacktop in two lifts with a gravel base of 8″ or even 12″.

We offer full or partial basketball, tennis, and pickleball court installations, with custom striping done in-house.

Sections that need to be revised or terminated will have their current pavement and gravel taken away, then the leftover space will be filled with dirt, topsoil, and seeds.

Asphalt assembly and maintenance can be more effortless and rapid than setting up concrete or brick, since there are fewer actions to accomplish the project.

ASPHALT PAVING PROCESS

STEP 1.

DEMO & BASE PREPARATION

Upon entrance, the squad will take away the present surface of the driveway, install the new stone base, grade, make it pressed down and ready for examination with the local village or city as directed.

Once the base is arranged, the driveway will mostly be able to be used as a parking lot.

STEP 2.

INSPECTIONS

Subsequent to base preparation, we shall arrange any necessary base inspections.

After the inspection has been approved, we will arrange for the installation of the pavement to take place within 1-3 days after the base has been prepared, depending on the weather conditions.

Most villages do not require anyone to be present during inspection, but do require the permit to be shown on a front window or door as well as have approved plans available if needed.

If a base inspection is not a requirement for some Villages, we will notify, and the paving can proceed promptly.

STEP 3.

PAVEMENT INSTALLATION

The asphalt crew will finish the driveway by pouring the asphalt and cutting it off to vehicles.

When constructing, contact the local police station to gain permission to park on the road.

Are you looking for Asphalt Paving Sevices in Somers?

Total Paving provides the highest quality asphalt paving services in Somers, Wisconsin. Our experienced professionals will help you find the perfect solution to suit your needs.

CARE AND MAINTENANCE

AFTER PAVING COMPLETION

Entering and leaving your driveway should be a straight line.

Keep from turning the steering wheel when the automobile is not in motion or in an isolated region.

Avoid putting items with sharp points on the driveway for the next 48 hours, like high-heeled shoes, bicycle stands, roller blades, lawn mowers, and trailers.

Do not let vehicles park in your driveway for extended periods.

Refrain from going past the edges of the driveway when driving.

If there is a drought, permit water to trickle over your driveway to keep it from cracking due to extreme dryness.

To ensure your driveway has had sufficient curing time, seal-coat it between 60 days and a year after its completion.

Seal-coat your driveway yearly.

SEAL COATING

COAL-TAR OR ASPHALT EMULSION APPLIED OVER ASPHALT SURFACES TO PROTECT FROM DAILY FROM DAILY DESTRUCTIVE FORCES.

1.

Safeguards against natural phenomena like sunlight, snow, ice and salt.

2.

Safeguards from the crumbling effects of oil, gas, and dangerous chemicals.

3.

Augmenting water runoff by plugging asphalt pores and creating a flat surface.

4.

Makes sweeping, cleaning and looking after asphalt more straightforward.

5.

Enhances the aesthetic of any property with a new black finish to asphalt.

6.

Increasing the service life of existing asphalt and cutting repair costs for savings.